Brief:

Reduce cost of new store concept programme through value-engineering current fixtures

Example Solutions:

Pre-faced materials to replace spraying (more durable & consistent) Simplified configuration of desks Reduced number of Production Processes by 15% and Parts by 8%

Benefits:

Reduced costs by a further 7% - following on from a 25% reduction in 2004 Lowered ‘Installed Cost’ and less time on site