Brief:
Drive cost out of all areas of existing fixtures and installation
Example solutions:
Reduce
- Simplified unitary / eliminated left and right-handed units .
- Amended certain dimensions slightly to increase sheet yield
- Re-designed centre floor ‘Welcome’ unit from ceiling-fixed to floor-fixed
- Reduced number of Parts by 30%
- Introduced foil wrap technology and pre-faced materials to simplify production
- Incorporated graphics onto system backpanels
Benefits
- Reduced equipment costs by over 50%
- Reduced leadtimes through Kanban methodology